
04 / FACILITY PREPARATION
Dry Ice Cleaning Facility Checklist
Organize the details a cleaning crew needs before arrival. Turn your answers into an action list for access, utilities, work-area controls, and handoff.
YOUR PROJECT DETAILS
Bring the right details to the planning call.
Complete the project fields first. Then enter your name, email, and phone number to unlock your results and report.
Use the dry ice cleaning facility checklist to organize the details needed before a cleaning visit. Start with your equipment list, access route, and site contacts. Then identify the items that still need a decision or a supporting record.
How to use the dry ice cleaning facility checklist
Mark each planning item as documented, not yet documented, or unknown. Choose documented when a named person or supporting record is available. The tool separates the items you have documented from those that still need attention.
Assign owners to open items
The report suggests a department to involve for each open item. Replace that suggestion with a named person at your facility. Collect the equipment list, access plan, working hours, utility information, and inspection requirements before the planning call.
Review utilities and work-area controls
The selected equipment and nozzle determine the compressed-air requirements. Confirm those requirements with the contractor. Dry ice handling and blasting also require a site-specific review of ventilation, CO2 exposure, personal protection, and nearby activity. The checklist does not calculate ventilation capacity or establish exposure limits.
Share your facility cleaning checklist
A completed checklist records your answers. It is not a work permit, a complete risk assessment, or a safety certificate. Share the report with the contractor and the person responsible for the site. Resolve the scope and responsibilities before confirming the work.
Keep the checklist current as the scope develops
Record the date of your review and the person responsible for each open item. For example, a changed work window may require a new access arrangement. Recheck the equipment list after any scope change, and share the latest version with the contractor. Before booking, ask your site contact to confirm which preparation tasks remain open. Use the report as a working record for that discussion.
Related planning resources
Explore all five free cleaning tools.
Further reading Cold Jet dry ice safety guide.